Choose your region to see content specific to your location

  • Solutions

    Strategy & Performance

    • Sustainability Strategy
    • Sustainability Reporting
    • Sustainable Finance
    • Sustainability Assurance
    View all

    Sustainability Challenges

    • Climate Resilience & Net Zero
    • Nature, Natural Capital & Biodiversity
    • Energy Transition​
    • Waste & Circularity
    • Social & Community Impact
    • Responsible Sourcing
    View all

    Project Delivery

    • Technical Advisory & Transaction Support
    • Concept & Feasibility
    • Planning & Permitting
    • Design & Project Implementation
    • Operations & Compliance
    • Decommissioning
    View all
  • Sectors

    Sectors

    • Built Environment
    • Consumer Goods & Retail
    • Finance
    • Government and Communities
    • Healthcare
    • Infrastructure
    • Manufacturing & Industry
    • Mining & Minerals
    • Power, Renewables and Energy
    • Technology, Media & Telecoms
    View all
  • Projects
  • Content Hub

    Content Hub

    • Insights
    • News
    • Events
    Explore all content

    Featured

    Aerial view of a construction site with cranes and diggers
    Insight

    Construction vibration: How to avoid complaints, delays, and damage

    11 September 2025

    8 minutes read


    As development moves closer to homes, businesses, and sensitive areas, construction vibration is an often-overlooked risk. This guide explains what vibration is, how it affects people, buildings, and wildlife, and how to reduce its impacts on your project.

    Read more
  • About

    About

    • Leadership
    • Locations
    • Making Sustainability Happen
    Overview

    Our mission

    SLR’s purpose is Making Sustainability Happen.

    We achieve this by having a team of expert advisors and technicians, who partner with our clients to tackle some of the world's most complex sustainability challenges, by utilising our collaborative and entrepreneurial ‘One Team’ culture.

    Read more
  • Careers
  • Contact
  1. Public Documents

Public Documents

The documents below are the only SLR documents available for public viewing. If you are looking for a private document, please use the link we have provided to you. If you have any questions, please do not hesitate to contact us.


  • 15 August 2025

    Final Layout and Environmental Management Programme for the 132kv Overhead Powerline between the existing Bon Espirange and Komsberg Substations and the 400kv Loop In Loop Out (LILO) at Komsberg Substation Located withintThe Western Cape, and the Northern Cape, South Africa

    Final Layout and Environmental Management Programme

  • 12 August 2025

    BW Kudu - Proposed Appraisal Well Drilling in Block 2814A (PPL 003), Orange Basin, off the coast of southern Namibia

    Final ESIA Report

  • 08 August 2025

    TEEPSA - Deep Western Orange Basin (DWOB) Exploration Drilling EIA off the West Coast of South Africa

    Draft Environmental Impact Assessment Report

  • 01 August 2025

    Rhino Oil and Gas – EIA for Exploration Right (ER) (ER reference: 377)

    Environmental Authorisation

  • 01 August 2025

    Afro Energy - Environmental Impact Assessment Process for Exploration Activities in ER383 in the Free State and Mpumalanga Provinces

    Record of Decision

  • 11 July 2025

    Main Street Survey Activities Block 11B/12B South Coast, South Africa

    Draft ESIA

Previous Next

Making Sustainability Happen

Company

  • About Us
  • Contact
  • Careers
  • Feedback
  • Our Locations

Our work

  • Solutions
  • Sectors
  • Projects
  • Content Hub
  • Public Documents
  • Technical Services
  • Linkedin
  • YouTube
  • Advisory Digest Sign Up

© 2025 SLR Consulting Limited

Design by Renowned • Built by Gittings Studio

  • Terms & Conditions
  • Policies & Reports
  • Modern slavery (UK)
  • Supplier Code of Conduct